Concrete pumping
Featured
Pumping of Iran Frameco ready-mix for foundations, slabs and walls.
Tehran، AlborzReplies within 24 h
Foundations & slabs (floors 1–4): 5,000,000 IRR; walls & columns: 5,100,000 IRR per m³. Minimum 80 m³ per pour (shortage rate pending confirmation). No pumping for C6/C8.
From
5,000,000 IRR
per m³