Ready-mix concrete prices

Strength classper m³ · Official list 19 Oct 2026
Net price
47,000,000
Chute (incl. transport)
59,500,000
With transport & pump
64,000,000
Pour stages

One stage = one delivery.

1
Placement
12 mixersMixer shortage: 4 m³ · 48,000,000 IRR5,168,000,000 IRR
2
Placement
3 mixersMixer shortage: 3 m³ · 36,000,000 IRRPump shortage: 62 m³ · 316,200,000 IRR1,506,000,000 IRR
Pricing rules
  • Mixer 7 m³; empty space in a stage's last mixer is charged at the transport rate.
  • Pumping min. 80 m³ per stage; shortfall charged at the pumping rate (pending confirmation).
BreakdownC25
Total volume
98 m³
Concrete
4,606,000,000 IRR
Transport
1,176,000,000 IRR
Mixer shortage
84,000,000 IRR
Pumping
491,800,000 IRR
Pump shortage
316,200,000 IRR
Total
6,674,000,000 IRR
≈ 667,400,000 Toman
  • The pump-shortage rate (pumping fee × missing m³) awaits Iran Frameco confirmation.