Representative photo
Demo supplier (fictional)Ready-mix concrete

Hot-weather concrete (retarded)

Holds slump for up to 90 minutes in heat and reduces thermal cracking.

TB
Unit price
50,000,000IRR/ m³

Variants & prices

Demo data

Specifications

Strength class
C25 – C30
Slump retention
90 minutes
Delivered temperature
Max. 32 °C
Delivery
7 m³ mixer truck, chute or pump
Unit
m³

Delivery & terms

Demo: delivered to site by the supplier’s fleet

Payment terms
Demo: 30% advance, balance on delivery
Quotation validity
5 days
Availability:In stock
Lead time:24 hours after order

Engineering & documents

Applications

FoundationsSlabs and decksColumns and walls

Standards

  • ASTM C94Sample — not verified
    Specification for Ready-Mixed Concrete
  • EN 206Sample — not verified
    Concrete — Specification, performance, production and conformity

Certifications

  • ISO 9001:2015Sample
    Issued by: Certification body (sample)

Project references

12-storey residential complex

Sample
Karaj2025820 m³

Urban overpass

Sample
Tehran2024492 m³

Technical documents

  • Hot-weather concrete (retarded) — datasheet
    Datasheet · 2 pages
    Sample — no file
  • Hot-weather concrete (retarded) — test report
    Test report · 4 pages
    Sample — no file

Ask the supplier

Ask a technical question, a special price or a delivery date.

Related products